Capital Bill FY2020 Funding: Infrastructure Improvements at the MidAmerica St. Louis Airport
CSFA Number: 494-60-2831
Agency Name
Department Of Transportation (494)
Agency Identification
Exempt - PA 102-1092 - Effective 6/10/22
Agency Contact
Joseph Segobiano
217-558-2948
Joseph.Segobiano@illinois.gov
Short Description
Provide state funding assistance for capital improvement and development of Taxiway Lima and Taxiway Lima Bridge at the MidAmerica St. Louis Airport (BLV) in Belleville, IL
Federal Authorization
Not applicable
Illinois Statue Authorization
P.A. 101-0029 Section 107
Illinois Administrative Rules Authorization
N/A
Objective
The MidAmerica St. Louis Airport (BLV) in Belleville, IL will construct Taxiway Lima and Taxiway Lima Bridge for use by Boeing aircraft. Boeing will build a new facility and the taxiway and bridge will connect the main runway to this facility.
Prime Recipient
Yes
UGA Program Terms
The MidAmerica St. Louis Airport (BLV) in Belleville, IL will receive $25 million dollars from the Capital Bill FY2020 to construct Taxiway Lima and Taxiway Lima Bridge. Any overages will be the responsibility of the Airport. The Airport will follow all the project requirements as dictated by IDOT concerning forms to be submitted and reporting during and upon completion.
Eligible Applicants
Government Organizations;
Applicant Eligibility
The MidAmerica St. Louis Airport (BLV) in Belleville, IL must remain publicly owned and open to the public. The airport must be in compliance with the FAA federal grant assurances. The airport owner must meet and comply with the Grant Accountability and Transparency Act (GATA) 30 ILCS 708 requirements. Follow all requirements of transportation Bond Funds 30 ILCS 415.
Beneficiary Eligibility
Not applicable
Types of Assistance
Project Grants
Subject / Service Area
Public Safety
Credentials / Documentation
Not applicable
Preapplication Coordination
An environmental impact assessment is required for this program. Alternative environmental reporting and documentation may be acceptable based upon the project type.
Application Procedures
Proposed project must be submitted with all regular documentation currently required during the Transportation Improvement Proposal (TIP) request process, including scope, description, sketch, and signed data sheet (Form AER-104), and budget (Form AER-102), along with any other forms specific to the proposed project.
Criteria Selecting Proposals
FAA and local government approval of plans and specifications
Award Procedures
Project will be issued a Program Letter through the IDOT Office of Planning and Programming. Upon receipt of Program Letter, sponsor can commence eligible work on project toward submittal of plans for state-supervised local letting and finalization of GATA procedures, as well as issuance of agency agreement
Deadlines
Not Applicable
Range of Approval or Disapproval Time
From 90 to 120 days
Appeals
Not Applicable
Renewals
Not Applicable
Formula Matching Requirements
None Required
Uses and Restrictions
Funds are appropriated by the State of Illinois legislature for this project with the stipulations that the airport sponsor adheres to current Illinois state statutes and the Illinois Aeronautics Acts.
Reports
During the project, the sponsor and their retained consultant monitors performance to ensure that timely schedules are maintained. Periodic reports, as required, are forwarded to the Division of Aeronautics . The recipient periodically submits form 5370-1, the Construction Progress and Inspection Report. These reports are different than the financial reports, which are required separately. Project performance monitoring is conducted through site visits and reports. Reports must be filed quarterly with the Division of Aeronautics or as frequently as determined by the Division of Aeronautics.
Audits
Recipient sponsor's records are required to be made available for inspection by IDOT, OEIG, and any other auditing state agency.
Records
An airport layout plan must be kept up to date and available as long as the grant agreement lasts, ordinarily a period of 20 years. Accounting records reflecting all project costs, books, documents, and records pertinent to grants are to be retained for 3 years after date of submission of final expenditure report.
Account Identification
MidAmerica St. Louis Airport Taxiway Lima and Taxiway Lima Bridge -
Obligations
FY2022: 25,000,000.00
Range and Average of Financial Assistance
$25,000,000.00
Program Accomplishments
Sponsor has completed the transportation Improvement Proposal (TIP) request process, including scope, description, sketch, and signed data sheet (Form AER-104), and budget (Form AER-102).
Regulations, Guidelines, and Literature
N/A
Regional or Local Assistance Location
1 Langhorne Bond Drive, Springfield, IL 62707
Headquarters Office
1 Langhorne Bond Drive, Springfield, IL 62707
Program Website
N/A
Example Projects
Not Applicable
Published Date
1/20/2022
Funding By Fiscal Year
FY 2022 : $25,000,000
FY 2026 : $545,874
Federal Funding
None
Notice of Funding Opportunities
Agency IDAward RangeApplication Range